When a roof needs replacing, and when it does not
Not every failing roof needs to come off. A membrane with sound laps and no wet insulation can often be repaired, or resurfaced with a coating system, for a fraction of the cost of a tear-off. What decides it is usually the condition of the insulation beneath, not the surface you can see.
We will tell you which you are dealing with before you commit to anything, and we will say so if the answer is that you have three more years in the roof you have.
What we install
Two-ply SBS modified bitumen, torch-applied. SBS stays flexible at low temperature, which is why it is the assembly we build on in this climate. It is what most of our work is.
SBS modified bitumen, self-adhered. The same membrane without an open flame, for occupied buildings, hot-work restrictions, and roofs where torching is not appropriate.
APP modified bitumen. Where the specification calls for it.
Coating and restoration systems. Where the existing membrane is sound enough to resurface rather than replace, this extends the roof’s life without a tear-off. It is not always available, and we will not recommend it on a roof that has taken water into the insulation.
Asphalt shingles on steep-slope roofs.
We specialise in modified bitumen. It is the assembly we build on, and concentrating on one family of systems is how we stay good at it. Where a building calls for a single-ply system — TPO, PVC or EPDM — tell us and we will point you to someone who specialises in it. We remove and replace built-up, single-ply and other existing assemblies on tear-off.
What a replacement includes beyond the membrane
Most of what fails on a flat roof is not the field membrane. Every replacement we quote addresses:
- Roof insulation and vapour barrier
- Decking and sheathing replacement where it is required
- Sheet metal — flashings, copings, counter-flashings and edge metal
- Roof drains, scuppers and internal drainage
- Skylights, curbs and penetrations
- Snow retention
- Fall-protection anchors, installed
How a replacement runs
- Site assessment. We walk the roof, establish the existing assembly, check the insulation, and identify what is actually wrong.
- Written quotation. Scope, price, and what is excluded.
- Contract. A written agreement with a defined payment schedule before any work begins.
- Deposit, on execution of the contract.
- Materials and mobilization. Draw 1 falls due on delivery to site.
- Tear-off, decking and insulation. The deck is inspected and repaired, then the vapour barrier and insulation go on. Draw 2 falls due here.
- Membrane. The new roof is installed and detailed.
- Substantial completion. We issue a notice, you acknowledge it, and Draw 3 falls due less the holdback.
- Holdback release, after the lien period expires.
What you get in writing
A written contract with a defined payment schedule, so nobody is guessing what falls due when.
A ten percent holdback, retained by you from each progress payment in accordance with the Prompt Payment and Construction Lien Act, and released on expiry of the sixty-day lien period.
A certificate of substantial performance, which we issue and post promptly. That is what starts the lien period running, and a contractor who does not issue one leaves you exposed for longer than you need to be.
A statutory declaration, on request and as a condition of holdback release, confirming that our subcontractors and material suppliers have been paid.
Invoices payable within fifteen days.
Decking, and what happens when it is worse than expected
Nobody knows the true condition of a deck until the old roof is off. This is the part of a re-roof that produces disputes, so we handle it the same way every time.
Where the deck needs work beyond what was quoted, we stop, price it, and issue a written change order describing the scope, the price and the effect on the schedule. It takes effect when you sign it, and not before. We do not carry on and add it to the final invoice.
Warranty
We warrant our workmanship for one year from substantial completion.
Manufacturer warranties on the materials pass through to you at substantial completion, and we will help you register them. Most manufacturers require documented, regular inspection to keep a material or No Dollar Limit warranty in force — which is what our Roof Inspection Program is designed to provide.
What it costs
We do not publish prices, because the honest answer is that a replacement depends on roof area, the assembly specified, the insulation, the condition of the deck, access to the roof, the number of penetrations, and whether the existing roof comes off or is resurfaced. A number quoted without seeing the roof is a number that changes later.
What we will do is walk the roof, tell you what it needs, and give you a written quotation you can hold us to.
Request a replacement quote → — tell us the building, the approximate roof area, the age and membrane if you know them, and what is wrong.